Flora Garden Update

Our landscaping to the gardens are now taking shape with the terraces  in place. The pool decking base is down and the roadway is currently  under construction this week by Side Belediyesi. 
 
Buildings A,B,C & D all now have the windows installed and  are plastered. B4 is our show apartment, all the sanitary ware is now fitted and we hope to have the kitchen fully installed by week 48. See Flora Garden photo gallery for our latest pictures.